| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Loading or unloading building materials manually | 200 | t. |
| Loading construction waste onto a car | 600 | Zil |
| Unloading or loading building materials with a crane | 50 | t. |
| Marking of buildings and structures with the device of callouts of axes, horizon marks | from 3000 | PCS. |
| Welding works Metal prices on the day of work performance | 100 | % |
| Installation of air conditioners No. 7-9 with material up to 2m. / further 1 m. - 300 UAH. | 1850 / + | PCS. |
| Reinforcement of openings with metal structures | dog. | ed. |
| Works that cannot be rationed (according to the actual time spent) | 75 | person / hour |
| Scaffold assembly | 40 | м² |
| Scaffolding | 20 | м² |
| Scaffold rental | 5 | m²/day |
| Mechanisms and transport | fact | . |
| Carrying building materials and cargo up to 10 m, for each next 10 m and each floor is added | 150 | t. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling of metal structures | 1500 | t. |
| Dismantling of a concrete wall 90 mm thick. | 1000 | м² |
| Dismantling of a concrete wall 120 mm thick. | 1500 | м² |
| Dismantling of a concrete wall 160 mm thick. | 2000 | м² |
| Dismantling a concrete bathroom | 2700 | PCS. |
| Dismantling the wall of expanded clay concrete | 1300 | м³ |
| Hole punching Dima. 150 mm. In the foundation blocks, width. 40/60 cm. | 250/380 | PCS. |
| Opening in foundation blocks 1×2 m thick. 40 cm | 2500 | PCS. |
| Opening in foundation blocks 1×2 m thick. 50 cm | 3000 | PCS. |
| Opening in foundation blocks 1×2 m thick. 50 cm. Opening in a concrete wall | 3000 | м³ |
| The device of apertures in a brick wall of thicknesses. 120 mm. (without jumper and amplification clip) | 250 | м² |
| The device of apertures in a brick wall of thicknesses. 250 mm. (without jumper and amplification clip) | 520 | м² |
| Breakdown of cement/concrete screed | 60/130 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Manual excavation | 300-350 | м³ |
| Breakdown of old foundations, heavy soil, builds. garbage, asphalt with rubble | 600 | м³ |
| backfilling | 200 | м³ |
| Ground planning | 40 | м² |
| The device of the underlying layer of crushed stone | 250 | м³ |
| The device of the underlying layer of sand | 20 | м² |
| The device of the underlying layer of expanded clay | 20 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Screed reinforcement | 20 | м² |
| Cement screed device (up to 50 mm.) | 100 | м² |
| Cement screed device (up to 100 mm.) | 130 | м² |
| Self-levelling floor screed | 70 | м² |
| Concrete works | 500 | м³ |
| Concrete work (formwork, pouring) mixer | 400 | м³ |
| Production of reinforcing frames, foundations / armored belt under the roof | 50/60 | m.p. |
| Installation of reinforced concrete structures: blocks, slabs, marches, crossbars, etc. (faucet) | 100-200 | PCS. |
| Preparing the solution manually | 250 | м³ |
| Preparing concrete by hand | 400 | м³ |
| Formwork manufacturing | 60 | м² |
| Formwork installation | 50 | м² |
| Formwork dismantling | 25 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Horizontal waterproofing with roofing felt or film dry | 10 | м² |
| Vertical waterproofing with roofing felt or film dry | 15 | м² |
| Horizontal waterproofing with bituminous mastic | 40 | м² |
| Vertical waterproofing with bituminous mastic | 50 | м² |
| coating (liquid) waterproofing device in 1 layer / also rubble concrete | 50-70 | м² |
| Special waterproofing device mortar with reinforcing mesh | 80 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Demolition of a brick wall with lime/cement mortar | 0.7 /1.5 | PCS. |
| Dismantling cinder block, shell rock | 5 | PCS. |
| Cleaning bricks from mortar and dirt | 1,50 | PCS. |
| Brickwork walls rough | 4 | PCS. |
| Brickwork wall cladding red front / ceramic | 7 | PCS. |
| Bricklaying with decorative brick for jointing / laying of target fence cards | 9 | PCS. |
| Brickwork pillars | 15 | PCS. |
| Brick laying of smokers with the device and "mopping" of channels red / front, ceramic | 10/12 | PCS. |
| Bricklaying | 80 | м² |
| The device of partitions made of bricks | 4 | PCS. |
| Wall masonry from cinder block, shell rock | 15 | м² |
| Wall masonry from Foam block, gas block 1st floor / 2nd and subsequent floor | 30/+5 | PCS. |
| Wall masonry from ceramic blocks | 35 | PCS. |
| Installation of jumpers threw. corner / concrete (manually) | 100 | PCS. |
| Sealing gaps / holes | 20/25 | m.p. / pcs. |
| Manufacture and installation of barbecue | from 15000 | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Construction of rubble concrete foundations to ground level | 600 | м³ |
| Construction of rubble concrete foundations to ground level | 600 | м³ |
| Production of steps from buta | 2000 | м³ |
| Rubble stone pillars up to 1.5 m / up to 3 m | 600/800 | m.p. |
| Fence and foundation made of rubble stone with one-sided jointing up to 30 cm wide and up to 80 cm high. | 1800 | м³ |
| Fence and foundation made of rubble stone with one-sided jointing up to 30 cm and a height of over 80 cm. | 1500 | м³ |
| Fence and foundation made of rubble stone with one-sided jointing with a width of 30-50 cm and a height of up to 80 cm. | 1400 | м³ |
| Fence and foundation made of rubble stone with one-sided jointing with a width of 30-50 cm and a height of 80-150 cm. | 1600 | м³ |
| A fence made of rubble stone with one-sided jointing and a width of more than 50 cm. | 1200 | м³ |
| A fence made of rubble stone with double-sided jointing and a width of more than 50 cm. | 1500 | м³ |
| Laying cards from rubble stone with double-sided jointing | 1800 | м² |
| Internal jointing of rubble masonry | 200 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling | 50 | % |
| Corrugated fence (up to 2.0 m) | 130 | м² |
| Chain link fence | 80 | м² |
| Wooden fence (rough board) | 170 | m.p. |
| Prefabricated sectional reinforced concrete fence (4 sections) | 250 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling the plasterboard ceiling | 60 | м² |
| Dismantling plasterboard walls | 50 | м² |
| Installation of a ceiling from GKL straight with a frame device | 130 | м² |
| Installation of walls from GKL direct with a frame device | 120 | м² |
| Arrangement of partitions from gypsum plasterboard (excluding works on thermal and sound insulation) | 180 | м² |
| Installation of slopes from plasterboard, ledges and multi-level drops on ceilings and walls | 100 | m.p. |
| Installation of GKL slopes and doors | 100 | m.p. |
| The device of partitions from GKL - curvilinear | 200 | м² |
| Glue drywall installation | 100 | м² |
| Installation of gypsum boards with frame reinforcement, slopes for straight / curved stretch ceilings | 120/150 | m.p. |
| Installation of radius ceiling depressions | 150 | m.p. |
| Thermal sound insulation device ( 1 layer - 50 mm) wall / ceiling | 40/50 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling of the floor from linoleum (carpet) | 15 | м² |
| Dismantling of PVC tiles | 20 | м² |
| Dismantling of wooden floors | 40 | м² |
| Dismantling of parquet floors | 40 | м² |
| Removing the old skirting board | 7 | m.p. |
| Felling of cement skirting boards | 15 | m.p. |
| Floor covering linoleum, carpet on the finished base | 25 | м² |
| Laminate floor installation | 60 | м² |
| Laying the substrate under the laminate with gluing the seams roll / sheet | 10/20 | м² |
| Parquet flooring | dog. | м² |
| Parquet floor sanding | dog. | м² |
| Arrangement of wooden tongue-and-groove floors on supports (lags) | 200 | м² |
| Flooring from plywood, chipboard, fiberboard, OSB, magnesite board (on the finished base) | 80 | м² |
| Flooring from plywood, chipboard, fiberboard, OSB, magnesite board (by logs) | 160 | м² |
| Flooring from plywood, chipboard, fiberboard, OSB, magnesite board (by logs) | 160 | м² |
| Plastic plinth device | 20 | m.p. |
| Installation of wooden skirting boards, MDF | 60 | m.p. |
| Installing floor mats | 50 | m.p. |
| Installation of decorative thresholds | 50 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling of the ceiling from Armstrong up to 3 m / over 3 m. | 30 | м² |
| Dismantling of frame wooden partitions / plastered | 130/150 | м² |
| Dismantling of plastic lining | 30 | м² |
| Finishing ceilings with clapboard plastic / MDF with a frame device | 100 | м² |
| Finishing ceilings with plywood, chipboard, OSB board with a frame device | 120 | м² |
| Wall decoration with clapboard plastic / MDF with a frame device | 90 | м² |
| Wall decoration with plywood, chipboard, OSB, board with a frame device | 80 | м² |
| Finishing slopes clapboard plastic / MDF | 80 | м² |
| Gluing plastic / MDF corners (more than 4 corners - Decoration) | 25 | m.p. |
| Laying soundproofing on the walls, slopes / ceiling under the plasterboard sheathing, etc. (50 mm.) | 40/50 | м² |
| Armstrong false ceiling installation | 80 | м² |
| Installation of cornices / blinds | 80/100 | PCS. |
| Installation of decorative ventilation grilles, inspection doors | 50 | PCS. |
| Pasting surfaces with self-adhesive films | 70 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling of lining with preservation | 70 | м² |
| Dismantling of a framework under lining | 40 | м² |
| Arrangement of a wooden frame for lining - wall | 70 | м² |
| The device of a wooden frame for lining - ceiling | 90 | м² |
| Installation of wooden lining on the walls according to the finished frame | 120 | м² |
| Installation of wooden lining on the ceilings on the finished frame | 170 | м² |
| Installation of wooden lining on slopes according to the finished frame | 100 | m.p. |
| Installation of finishing corners and decorative strips wall / ceiling | 30/35 | m.p. |
| Sanding lining | 80 | м² |
| Priming of wooden products | 40 | м² |
| Covering lining with filler | 60 | м² |
| Aging of logs (for 1 pc.) | 100 | m.p. |
| Lacquering 1 layer | 50 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Removal of lime whitewash from the ceiling / wall | 35/30 | м² |
| Dismantling of plaster to a height of up to 3 m. | 50 | м² |
| Dismantling of plaster to a height of over 3 m. | 60 | м² |
| Notching device on brick walls | 40 | м² |
| Notching on concrete walls | 70 | м² |
| Stuffing a metal mesh on the walls under the plaster | 35 | м² |
| Plastering of walls up to the lighthouse to a height of up to 3 m. | 120 | м² |
| Plastering of walls along lighthouses to a height of up to 3 m with gypsum-based compositions (Rotband type, etc.) with grout | 120 | м² |
| Plastering of walls along lighthouses to a height of up to 3 m with gypsum-based compounds (Rotband type, etc.) with grout | 120 | м² |
| Plastering of curved walls along lighthouses to a height of up to 3 m with gypsum-based compounds (Rotband type, etc.) with grout | 150 | м² |
| Wall plastering on lighthouses over 3 m. | 150 | м² |
| Plastering walls on lighthouses over 3 m with gypsum-based compounds (Rotband type, etc.) with grout | 150 | м² |
| Plastering slopes with cement-lime mortar | 100 | m.p. |
| Plastering slopes with gypsum-based compounds (Rotband type, etc.) with grout | 120 | m.p. |
| Plastering of pillars and columns of rectangular | 100 | m.p. |
| Plastering of rectangular pillars and columns with gypsum-based compositions (Rotband type, etc.) with grout (for one m.p. of one face) | 120 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Primer | 10 | м² |
| Primer with quartz sand (primer-paint, betokontakt) | 15 | м² |
| Linear wall putty | 90 | м² |
| Straight ceiling putty | 120 | м² |
| Puttying curvilinear perepals of multi-level ceilings under the frame | 90 | m.p. |
| Puttying curved walls | 100 | м² |
| Slope putty | 80 | m.p. |
| Wall gluing with stucco mesh | 50 | м² |
| Ceiling gluing with stucco mesh | 60 | м² |
| Gluing walls with fiberglass | 50 | м² |
| Gluing walls with fiberglass | 50 | м² |
| Putty on fiberglass walls | 80 | м² |
| Putty on fiberglass slopes on the walls | 70 | м² |
| Putty on fiberglass slopes on ceilings | 70 | m.p. |
| Putty on fiberglass ceilings | 120 | м² |
| Puttying with acrylic putty on the finished base as a separate type of work | 80 | м² |
| The device of a decorative baguette (rectilinear polystyrene) | 40 | m.p. |
| The device of a large-sized or patterned decorative baguette (rectilinear polystyrene) | 40 | m.p. |
| The device of a decorative baguette (curvilinear polystyrene) | 60 | m.p. |
| Painting a decorative baguette (polystyrene) | 40 | m.p. |
| Device polyurethane baguette (rectilinear) | 40 | m.p. |
| Device polyurethane baguette (large) | 60 | m.p. |
| Gluing polyurethane corners | 25 | PCS. |
| Gluing polyurethane sockets, decorations, consoles | 100 | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Removing old wallpaper from ceilings/walls | 25/20 | м² |
| Removal of old wallpaper from the ceiling / walls under particularly difficult conditions of dismantling | 35/25 | м² |
| Glue primer for wallpaper | 15 | м² |
| Wall papering | 40 | м² |
| Wallpapering on the ceiling | 40 | м² |
| Pasting textured wallpaper with a selection of patterns (expensive) wall | 60 | м² |
| Sticking textured wallpaper with a selection of patterns (expensive) ceiling | 80 | м² |
| Wallpaper painting | 50 | м² |
| Gluing decorative panels (fresco) | 10 | м² |
| Bamboo decorative wallpaper | 70 | м² |
| Sticking cork on the wall | 70 | м² |
| Gluing decorations from cork (as a product) | dog. | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Removing old paint from the ceiling | 40 | м² |
| Removing old paint from walls | 30 | м² |
| Lime whitewashed ceiling | 20 | м² |
| Lime whitewashing of plastered walls (1 time) | 15 | м² |
| Painting a straight ceiling with water-based paint for 2 times | 80 | м² |
| Painting smooth walls with water-based paint for 2 times | 60 | м² |
| Painting walls of complex configuration with water-based paint | 70 | м² |
| Painting walls with structural paint | 70 | м² |
| Wall painting 2 or more colors in one plane (through masking tape) | 70 | м² |
| Painting slopes and multi-level drops with water-based paint (ceilings) | 60 | m.p. |
| Painting slopes with water-based paint (walls) | 50 | m.p. |
| oil painting ceiling | 60 | м² |
| Oil painting of the walls | 40 | м² |
| Oil painting of windows | 70 | м² |
| Oil painting of doors | 70 | м² |
| Oil painting of previously painted doors with pop-filler up to 10% / up to 35% / restoration | 90/100 / dog | м² |
| Oil painting of floors for 1 time | 40 | м² |
| Oil painting of metal pipes | 20 | m.p. |
| Oil painting of metal gratings for 1 time | 70 | м² |
| Oil painting of heating radiators | 25 | rib |
| Oil painting of metal surfaces | 40 | м² |
| Removing rust from metal surfaces | 70 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling of windows, doors / with preservation | 70/120 | PCS. |
| Dismantling of ebb / window sills | 20/30 | PCS. |
| Restoration of wooden products by firing | 300 | м² |
| Installation of entrance doors | 700-1500 | PCS. |
| Installation of interior doors | 500 | PCS. |
| Installation of a metal-plastic window block | 12 | % |
| Installation of a metal-plastic door block | 15 | % |
| Installation of a metal-plastic balcony block, loggia: full-length | 15 | % |
| Closer installation | 250 | PCS. |
| Ebb / window sill installation | 40-60 | m.p. |
| Installation of window/door hinges | 40 | PCS. |
| Installing a door lock | 100 | PCS. |
| Installation of door cashing | 20 | m.p. |
| Glazing of windows and doors | 100 | м² |
| Strengthening windows and doors with mounting foam (as a separate type of work) | 10 | m.p. |
| Installing door stops | 30 | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling floor tiles (walls) | 25/30 | м² |
| Cladding of walls, floors with ceramic tiles (plain) | 250 | м² |
| Wall and floor cladding with small tiles | 350 | м² |
| Floor cladding "under the laminate" | 250 | м² |
| Mosaic wall and floor cladding | 450 | м² |
| Facing walls, floors with expensive tiles (large-sized tiles over 600 mm) | 300/350 | м² |
| Facing walls, floors with expensive tiles (large-sized tiles over 800 mm) | 450 | м² |
| Facing walls, floors with expensive tiles (large-sized tiles over 1000 mm) | 600 | м² |
| Facing columns with tiles (one side) | 250 | m.p. |
| Mosaic ceiling cladding | 500 | м² |
| Facing radii and roundings of pools in 3 planes with mosaics | 700 | м² |
| Mounting mirrors when laying tiles | 200 | м² |
| Facing radial steps with tiles | 450 | m.p. |
| Tiling radial walls | 300 | м² |
| Facing steps with ceramic tiles | 250 | m.p. |
| Facing slopes with tiles | 80 | m.p. |
| Washed down the outer corners of the tiles at 45 ° | 70 | m.p. |
| Drilling holes in ceramic tiles up to 32 mm./more | 120 | PCS. |
| Drilling holes in expensive tiles (pano) | 50 | PCS. |
| Tile grouting | 80 | м² |
| Mosaic tile grouting | 100 | м² |
| Grouting mosaic tiles with epoxy grout | 150 | м² |
| Jointing of sandstone stone with filling with a metal brush with water | 80 | м² |
| Alignment of walls along beacons with cement mortar for tiles | 25 | м² |
| Installation of indoor and outdoor corners | 100 | m.p. |
| Installation of the finished ceramic frieze and plinth | 80 | m.p. |
| Cutting tiles for plinth | 300 | m.p. |
| The device of the decorative wall of the bath (brick) | of 300 | PCS. |
| Installation of decorative paintings from tiles (except for glass panels and paintings) | 50 | PCS. |
| Installation of metal moldings (corners) | 250 | m.p. |
| Wall cladding with wild stone (sandstone) large-sized | 300 | м² |
| Wall cladding with wild stone (sandstone) small-sized | 300 | м² |
| Wall cladding with clinker tiles | 110 | м² |
| Wall cladding with marble | 600 | м² |
| Facing columns with marble | of 70 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling el. wiring | 3-10* | m.p. |
| Dismantling el. appliances | 30-200* | PCS. |
| Wire installation | 10 | m.p. |
| Cable installation | 20 | m.p. |
| Hole in the wall with a diameter of up to 26 mm. ( drywall / soft materials / hard materials / especially difficult work) | 10/30/50/100 | PCS. |
| Shtroba up to 30 × 30 mm in size. (soft materials / hard materials / especially complex work) | 30/50/100 | m.p. |
| Laying wire in a corrugated hose, metal hose, pipe + wire installation | from 15 * | m.p. |
| Laying wire in a corrugated hose, metal hose, pipe + cable installation | from 25 * | m.p. |
| Installation of a plastic channel cable | from 25 * | m.p. |
| Installation of el. panelboard on the wall | from 150 | PCS. |
| Installation of installation and junction boxes (drywall / soft materials / hard materials / especially difficult work) | 20/50/70/125 | PCS. |
| Niche in the wall for email. panelboard (soft / hard materials / especially complex work) | 200/400/800 | PCS. |
| Ground loop | from 1500 * | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Installation of sockets, switches and prepared places | 50 | PCS. |
| Installation of modular socket blocks | 90 | PCS. |
| Installation of spotlights, without assembly of the product | 80 | PCS. |
| Installation of wall lamps, sconces, without product assembly | from 125-10% | PCS. |
| Installation of shelf lamps, chandeliers, without product assembly | from 150-10% | PCS. |
| Installation of shelf chandeliers, without assembly of the product | from 250-10% | PCS. |
| Product assembly | dog. | PCS. |
| Installation of LED strip | 100-250 | m.p. |
| Connection of boilers, el. Plate, el. Boilers, exhaust fans | 150 | PCS. |
| Installation of the metering device el. Energy (installation and connection) 1f / 3f | 300/500 | PCS. |
| Connection / reconnection of the junction box | 150 | PCS. |
| Works in email switchboard (connection, dismantling, assembly, revision) | 50 | module |
| Standard intercom installation | 350 | PCS. |
| Diagnostics of an existing email wiring | 200 | point |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Drawing up a preliminary settlement map of the object | of 300 | . |
| Maintenance of sites / objects | from 500 | . |
| Other works | dog. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling mixers, siphons | 50 | PCS. |
| Dismantling of existing pipes (water supply, sewerage) | 30 | m.p. |
| Dismantling the toilet bowl (bidet) | 70 | PCS. |
| Washbasin dismantling | 50 | PCS. |
| Dismantling a metal bath | 100 | PCS. |
| Dismantling a cast iron bath | 200 | PCS. |
| Dismantling of heating radiators | 70 | PCS. |
| Dismantling of boiler, boiler, column | 100 | PCS. |
| Sewer installation | 150 | point |
| Installation of water supply | 350 | point |
| Heating installation | 400 | point |
| Installation and connection of a steel, acrylic bathtub with legs | 450 | PCS. |
| Installation and connection of a bathtub, acrylic with a hard base device | 600 | PCS. |
| Installation and connection of a corner with a rigid base device | 800 | PCS. |
| Installation and connection with hydromassage with hard base device | 1500 | PCS. |
| Installation and connection of a shower cabin | 1200 | PCS. |
| Installation and connection of hydrobox | 1500 | PCS. |
| Installation and connection of the toilet, floor bidet | 300 | PCS. |
| Installation and connection of the toilet bowl, hanging bidet with installation | 650 | PCS. |
| Installing a sliding shower screen | 500 | PCS. |
| Installation and connection of the washing machine (automatic) / built-in | 180 | PCS. |
| Installation and connection of a sink, washbasin with mixer, siphon | 250 | PCS. |
| Installation of mixer stands (water column) | 350 | PCS. |
| Installation of a cabinet with a washbasin with a mixer, a siphon with trimming the cabinet in place | 400 | PCS. |
| Installation and connection of the boiler | 400 | PCS. |
| Installing and connecting the column | 600 | PCS. |
| Installation and connection of a heating radiator / heated towel rail (plastic) | 350 | PCS. |
| Installation and connection of a heating radiator / heated towel rail (metal) | 450 | PCS. |
| Installation and connection of a heating boiler / wall-mounted | 1000 | PCS. |
| Installation of shut-off valves / shut-off valve | 70 | PCS. |
| installation of water purification filters 1/3 flask / centrifugal | 300 | PCS. |
| Installation of water meters with check valve | 400 | PCS. |
| Installation of a circulation pump with a safety pass supply/return | 700 | PCS. |
| Descent and set of water in the heating system with airing (1 time) | 250 | PCS. |
| Laying of metal pipes up to 25 mm. | 40 | m.p. |
| Same, plastic | 20 | m.p. |
| Laying of sewer pipes ChK | 50 | m.p. |
| The same from plastic | 25 | m.p. |
| Pipe fastening | 5 | m.p. |
| installation of accessories | 50 | PCS. |
| Insertion into the existing water supply system | 200 | PCS. |
| Device for a pipe 1/2 3/4 in brick / concrete | 25/50 | m.p. |
| Device for a pipe 50-100 mm in brick / concrete | 35/70 | m.p. |
| Installation of a floor heating pipe (without gluing polystyrene) | 90 | м² |
| Drilling holes for dia. 50 mm. brick / concrete | 50/100 | PCS. |
| Drilling holes for a turbo-boiler brick / concrete dia. 110 mm. S=400mm. | 300/450 | PCS. |
| Merilon dressing on pipes | 3 | m.p. |
| Comb mounting up to 50 mm. with connection | from 500 | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Primer | 10 | м² |
| Primer with quartz sand (primer-paint, concrete contact) | 20 | м² |
| Plastering of facades on lighthouses with cement mortar at a height of 3 m. | 120 | м² |
| Plastering of facades on lighthouses with cement mortar at a height of more than 3 m. | 150 | м² |
| Plastering slopes on facades with cement mortar | 100 | m.p. |
| Sticking sheet polystyrene foam on the walls along the lighthouses | 130 | m.p. |
| Sticking sheet polystyrene foam on the ceilings along the lighthouses | 150 | м² |
| Sticking of expanded polystyrene sheets on walls along beacons on curved surfaces | 180 | м² |
| Sticking of expanded polystyrene sheets on slopes | 80 | m.p. |
| gluing of expanded polystyrene sheets on slopes on curved surfaces | 100 | m.p. |
| Gluing polystyrene foam sheets to floors | 50 | м² |
| Installation of expansion dowels plastic (punching) (5-6 pcs.) | 30 | м² |
| Mesh wall reinforcement | 50 | м² |
| Mesh ceiling reinforcement | 60 | м² |
| Sticking reinforcing mesh on slopes | 40 | m.p. |
| Puttying facades on a reinforcing mesh | 60 | м² |
| Puttying facades on a reinforcing mesh on curved surfaces | 80 | м² |
| Puttying slopes on a reinforcing mesh | 50 | m.p. |
| Puttying slopes on a reinforcing mesh on curved surfaces | 50 | m.p. |
| Facade painting / microfur coat (roller (high-rise buildings)) | 60 | м² |
| Slope painting | 50 | m.p. |
| application of pebble plaster on walls such as "Bark beetle", "Drayvit", "Bayramix" | 80 | м² |
| Application of pebble plaster on slopes such as "Bark beetle", "Drayvit", "Bayramix" | 80 | m.p. |
| Applying pebble plaster to curved slopes | 80 | m.p. |
| Grinding on the foam surface of the walls after gluing | 30 | м² |
| Puttying the installation sites of plastic dowels | 5 | м² |
| Application of pebble plaster on radii such as "Drayvit", "Bark beetle", "Bayramix" | 140 | м² |
| Wall decoration with vinyl siding with a frame device | 100 | м² |
| Wall decoration with metal siding with a frame device | 150 | м² |
| Wall decoration with corrugated board with a frame device | 100 | м² |
| Finishing the ceiling with corrugated board with a frame device | 140 | м² |
| Finishing with siding, metal, clapboard slopes | 60 | m.p. |
| Wall insulation with mineral wool under a ventilated curtain wall (1 layer) | 50 | м² |
| Scaffolding: (from the plane of the facade) assembly, disassembly | 60 | м² |
| Depreciation, scaffolding rent | 5 | m²/day |
| Washing windows after work | of 50 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling of the existing roof with lowering and storage up to 10 m. | 60 | м² |
| Dismantling the insulation | 10 | м² |
| Dismantling of the sheathing of eaves or front overhangs, excluding scaffolding | 40 | m.p. |
| Drainage dismantling | 20 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Loading or unloading lumber | 150 | м³ |
| Carrying lumber up to 10 m / over 10 m. | 90/120 | м³ |
| storage of lumber in stacks with lathing | 75 | м³ |
| Bioprotective treatment of wooden roof structures | 20 | м² |
| The device of the truss system is simple. / difficult (1-4 rays / 5-10 rays) | 100/180 | м² |
| The device of dormer windows with device. Rafters, films, battens | 500 | м² |
| Installation of a frontal board with trimming of rafters. (excluding forests) | 70 | m.p. |
| Installation of a counterlattice | 25 | м² |
| Installation of the crate with a step of 50 cm under slate, euroslate, onduran, ondulin | 30 | м² |
| Lathing installation with a step of 40 cm under natural, composite, tiles | 30 | м² |
| Installation of the lathing with a step of 35 cm under the metal tile | 45 | |
| Installation of the lathing with a step of 25 cm under bituminous tiles | 55 | м² |
| Installation of the crate with a step of 35 cm for insulation | 55 | м² |
| Mounting the pressure rail under the vapor barrier | 25 | м² |
| Nakata device | 60 | м² |
| Installation of floor beams | 80 | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Installation of waterproofing | 25 | м² |
| Vapor barrier installation | 25 | м² |
| Roof insulation min. Cotton wool 1 layer | 40 | м² |
| Installation of OSB boards | 70 | м² |
| Installation of a metal tile is simple. / difficult ( 1-4 rays / 5-10 rays) | 90/160 | м² |
| Installation of corrugated board simple / difficult. | 80/110 | м² |
| Trimming of metal along the perimeter of the cornice overhangs "with incorrect roof geometry" | 25 | m.p. |
| Installation of composite metal tiles | 130 | м² |
| Installation of the underlayment (for bituminous tiles) | 30 | м² |
| Installation of bituminous tiles | 130 | м² |
| Slate installation | 50 | м² |
| Installation of slate, ondulin, onduri | 50 | м² |
| Installation of polymer sand tiles | 140 | м² |
| Installation of natural tiles | 250 | м² |
| The device of a soft roof - euroroofing material (1 layer / 2 layers) | 50/80 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Installation of a dormer window | 2200 | PCS. |
| Installation of junctions, skates, end strips, drip | 40 | m.p. |
| Connection device to chimneys and vent. channels | 600 | PCS. |
| Metal sheathing of chimneys, ventilation ducts and side walls, dormer, mansard roof structures | 220 | м² |
| Installation of side caps with frame | 110 | PCS. |
| Installation of snow retainers | 120 | PCS. |
| Installation of skate aerators | 80 | m.p. |
| Installation of pitched aerators | 450 | PCS. |
| Installation of umbrellas on pipe heads | 230 | PCS. |
| Ridge tape installation | 15 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Mounting metal on the frontal board | 35 | m.p. |
| Hemming of eaves and front overhangs of spotlights with a frame device | 120 | m.p. |
| installation of a gutter / bar gutter system | 90/60 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Site measurements, project preparation and estimates | 400-900 | |
| Site leveling | 500-800 | |
| Dismantling of old paving slabs, curbs, trays (from the cost of installation) | 40 | % |
| Felling of old concrete, asphalt up to 5 cm thick. | 70 | м² |
| Services of a perforator log house of concrete, dismantling of the old coating | 1200-1400 | м³ |
| Dismantling of concrete from 15 cm. | 3000 | м³ |
| Uprooting trees, stumps | 200-1500 | PCS. |
| special services Equipment (excavator, loader) | 350 | time |
| Working with special equipment (level control, manual) | 75 | h / hour |
| Cleaning, warehousing, carrying building materials and other things that interfere with work | 75 | h / hour |
| ground planning after excavator | 20 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Manual soil development (depending on the soil category) | 300-350 | м³ |
| Transportation of excess soil in points to the street or a pile | 200 | м³ |
| Loading construction waste onto a car | 120 | м² |
| Crushed stone preparation (depending on the transportation distance) | 40/50 | м² |
| Compaction of the base rammer | 30 | м² |
| Jointing crushed stone with screenings or backfilling in places with screenings on concrete to the marks | 15 | м² |
| Concrete preparation from ready-mixed concrete on site | 35-45 | м² |
| Concrete preparation with concrete preparation on site | 75-85 | м² |
| Reinforcement of concrete screed | 20 | м² |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| - with the number of tiles up to 40 pcs. /m²- "Clover" | 100 | м² |
| - with the number of tiles from 40 to 60 pcs. /m² - "Brick" | 115 | м² |
| - with the number of tiles from 60 to 80 pcs. /m² - "Old Town" | 130 | м² |
| - with the number of tiles over 80 pieces / m² - "Mix" | 140 | м² |
| Also with a complex pattern or more than 4 colors, add to each m² | 15-30 | м² |
| Cutting tiles at the junctions | 45 | m.p. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Sidewalk curb (curb) 50-65 cm long in a straight line | 30 | PCS. |
| Also along a curve with trimming or cutting into parts | 50 | PCS. |
| Road border section 30 × 15 cm. Length 65 cm. in a straight line | 100 | PCS. |
| Road border section 30 × 15 cm. Length 100 cm. in a straight line | 100 | PCS. |
| Cutting each joint of road bards 30 × 15 cm, at turns and radii | 35 | joint |
| Concrete trays in a straight line, 25-35 cm long. | 25-35 | PCS. |
| Cutting each joint of trays at an angle with turns and radii | 20 | joint |
| Installing a curb from the polisad | 15 | PCS. |
| Nazwa prac | Koszt UAN |
Jedn. miary |
|---|---|---|
| Dismantling and installation according to technological hatches marks | 600 | PCS. |
| Lowering of wells of the hatch to dia. 1m. | 1000 | PCS. |
| Lowering of wells of the hatch to dia. 1m. | 1000 | PCS. |
| Lowering of wells of the hatch to dia. 1.5 m | 1500 | PCS. |
| - Installation of storm water inlets and connections | 120 | PCS. |
| - Installation of pipes with a bed device | 60 | m.p. |
| - Installation of pipes, technological sleeves for water and cables | 50 | m.p. |
| - Installation of maintenance-free drainage pits for storm sewers | 500-800 | PCS. |
| - Installation of polyethylene trays with grating | 100 | PCS. |
| The device of porches and steps from concrete bricks and monolithic concrete | 1600 | м³ |
| Facing steps and porches with special concrete elements on glue | 15-25 | I would. |
| Paving from granite blocks 100×100 mm. Rows in a straight line | 180 | м² |
| Also a fan or a complex pattern | 250 | м² |